[07 Jul 2008] Construction of 2 double storey dwellings (4 Hirst Street)
[01 Dec 2008] Construction of one double storey dwelling to the rear of the existing dwelling and alterations and additions to the existing dwelling (4 Hirst Street)
[02 Jun 2010] two (2) lot subdivision of land
[02 Jun 2010] two (2) lot subdivision of land (4 Hirst Street)