[16 Mar 2012] demolish part of the existing building to create an opening to the west facing wall for the construction of a double door, and construction of a deck, pergola and screening above the double garage to west of site
[20 Nov 2013] Part demolition to create an opening within a garage wall (north elevation) to Unit 6 and the insertion of a new door and windows above