[03 Mar 2010] Construct four (4) dwellings on a lot. (Refused : 04/10/2010 by Delegated Authority) (4 Beaufort Court)
[18 Nov 2013] Construction of two (2) dwellings on a lot and subdivision of the land. (NOD Delegated : 15/04/2014 by Delegated Authority) (4 Beaufort Court)