Blackburn North Median RentThe House rent is 10% higher than last year. Surrounding suburbs | Floorplan | Map | Nearby rentals | Property Description: | A new benchmark in luxury living The Herbert is an exclusive collection of architecturally designed residences perfect for couples and families. Offering beautiful spaces, stylish features and lush garden surrounds. These 2 level luxury home that features new timber floors, carpet and tiled flooring through out. Not to mention stone bench tops, Bosh or Miele stainless steel appliances including gas cooktop, electric ovens and dishwashers. The master bedrooms all have walk in robes, whereas the additional bedrooms offer built in robes. Other features include separate powder room and laundry, ample storage and double lock up garages. In a prime location you are only minutes from great shops, schools, public transport, freeway and walking/cycling/running tracks. 35 Junction Road, Blackburn North $620pw Rent $2,694pcm Bond 3 Bed 0 Study 2 Bath 2 Car 34 Junction Road, Blackburn North $620pw Rent $2,694pcm Bond 3 Bed 0 Study 2 Bath 2 Car 11 Willow Street, Blackburn North $610pw Rent $2,651pcm Bond 3 Bed 1 Study 2 Bath 1+1 Car 16 Willow Street, Blackburn North $600pw Rent $2,607pcm Bond 3 Bed 1 Study 2 Bath 1+1 Car 17 | Planning History: | | [03 Jul 2013] Development of land for 50 dwellings, removal of native vegetation and reduction of standard car parking requirement | | [29 Oct 2014] Demolition of Existing Dwelling and Outbuilding | | [02 Dec 2014] Staged Subdivision of land into 46 Lots, common property and Staged Lot S2. The subdivision is in | | [03 Dec 2014] Forty seven lot subdivision | | [11 Dec 2014] Stage 1 - Multi Unit Development - Units 36-46 - Retaining Walls, Site Excavation & Slabs | | [24 Feb 2015] Stage 1 - Multi Unit Development - Units 1-6 & Units 16-21 - Retaining Walls, Site Excavation & Slabs | | [24 Feb 2015] Stage 2 - Multi Unit Development - Units 36-46 - Building Works - Slab to Completion | | [24 Feb 2015] Stage 1 - Multi Unit Development - Units 7-15 - Building Works - Retaining Walls, Site Excavation & Slabs | | [27 Feb 2015] Stage 2 - Multi Unit Development - Units 1-6 & Units 16-21 - Building works only - Slab to Completion | | [15 Apr 2015] Stage 2 - Multi Unit Development - Units 7-15 - Building Work - Slab to Completion | | [29 May 2015] Units 22-35 - Stage 1 Building Works Only - Multi-Unit Development | Property's zone, overlay, easement and land measurement | Search neighbour's planning permit | Property report from Government |
| | |