Malvern Median PriceThe House price is 3% lower than last year. Surrounding suburbsArmadale | $1,834,800 ![](/img/down.gif) | Caulfield North | $1,827,100 ![](/img/down.gif) | Glen Iris | $2,079,300 ![](/img/up.gif) | Hawthorn | $2,343,700 ![](/img/up.gif) | Hawthorn East | $2,266,400 ![](/img/up.gif) | Malvern East | $1,841,200 ![](/img/white.gif) | Toorak | $2,045,700 ![](/img/down.gif) |
| A1 Ascot Street, Malvern | Sold $4,500,000 in Jun 2014 [Rectify] | Last Sold $1,427,500 in Jan 2007 | Rent $1,650pw in Feb 2007 | House: 6 4 2 ![Car spaces Car spaces](/img/car.png) | Land size: 100 sqm [Measure] | Agent: Marshall White & Co | Distance: 7.7 km to CBD; 844 metres to Tooronga Station [Transport] |
|
| More Photos |
Map | Nearby prices | Property Description: | The backyard is north facing. The slope of land is Nearly Level. More about the land block... This distinctive and impressive c.1918 Attic style solid brick English-inspired home provides unparalleled family living in a prestigious location. Set in extensive, beautifully landscaped gardens of 13,000sqft (1,208m2) approximately, it comprises: elegant entrance hall, 6BRs (main-huge ensuite, guest-ensuite), interconnecting formal sitting and dining rooms, music room, study. A superbly appointed kitchen includes white marble benchtops and double freestanding Rosieres stove, while informal living/dining opens via French doors to the rear garden, IG gas heated saltwater pool and double remote rear garage with studio loft and bathroom. Retains exquisite pressed metal ceilings, open fireplaces, wine cellar. Also security, powder room, huge storage, ducted heating, air-conditioning and auto watering. Lot/Plan No: 1/PS742764 | Planning History: | | [10 Dec 2009] Construction of a multi-dwelling development in a Residential 1 Zone. Cost $1,500,000. Status: NOD | | [08 Mar 2013] Secondary Consent Amendment to approved Plans - changes to design layout so that each apartment is on one level only. Status: Lapsed | | [25 Nov 2013] Construction of a multi-dwelling development in a Residential 1 Zone. Cost $3,000,000. Status: Withdrawn | | [27 Oct 2014] Construction of a multi-dwelling development in a General Residential Zone and a reduction in the car parking requirement. Cost $4,600,000. Status: NOD | | [16 Apr 2016] Concurrent Planning Permit and Certification in accordance with the attached Plan of Subdivision PS more... | Search neighbour's planning permit | Property report from Government |
| | |