[2011年06月30日] Attach 'A' Stage 1 Boundary adjustment of existing lots 15&16 Section E in DP8855 Stage 2 The subdivision of proposed lots 102 and 103 Stage 3 The subdivision of proposed lots 101 and 104 Establish the legal flexibility for 19 and 21 Haig Ave to subd
[2011年06月30日] Attachment 'A' Stage 1 : Boundary adjustment of existing lots 15 & 16 Section E In DP 8855 Stage 2 : The subdivision of proposed lots 102 and 103 Stage 3 : Subdivision of proposed lots 101 and 104 Establish the legal flexibility for 19 Haig and 21 Ha