[2003年08月27日] Painting to the exterior of the building, replacement of the metal corner on the barge with a timber cap with under mould and construction of a timber picket front fence in accordance with the endorsed plans.
[2023年12月15日] Partial demolition of the dwelling and construction of a two storey addition to the rear of the site on a lot less than 300 sqm in a Neighbourhood Residential Zone and within a Heritage Overlay.