Hawthorn 平均房价House 价格比去年上升11% . 周边地区Abbotsford | $1,207,300 ![](/img/down.gif) | Burnley | $1,272,500 ![](/img/down.gif) | Hawthorn East | $2,266,400 ![](/img/up.gif) | Kew | $2,327,900 ![](/img/up.gif) | Kooyong | $2,232,000 ![](/img/down.gif) | Malvern | $2,251,400 ![](/img/down.gif) | Richmond | $1,454,900 ![](/img/up.gif) | Toorak | $2,045,700 ![](/img/down.gif) |
| 建筑平面图 | 地图位置 | 附近房价 | 详细描述: | 后院是朝 南面. 地块的坡度是 一般倾斜. 关于地块的详细描述... With a superb land area of some 542sqm, strong street appeal and rear access, this stunning solid brick (c1890) has been extended and enhanced to accentuate all the period features - at the same time providing instant family appeal and great liveability. Comprising: Three generous bedrooms with BIRs, study (4th bedroom), marble OFP's, bay window dining room, family room with bi-fold doors opening to sun filled alfresco area, gourmet granite kitchen, central bathroom, sep. laundry (potential 2nd bathroom), air-conditioning, ducted heating and a spacious garden. Just minutes' walk to Glenferrie Station, tram and shopping centre. Lot/Plan No: 1/PS704421 翻译中文 | 改建申请历史: | | [*] 被市政府指定为 Victorian heritage, more information | | [1997年11月10日] Dwelling Build'g & Works additions and alterations to existing dwelling (Approved : 10/11/1997 by Delegated Authority) | | [2003年02月25日] Part demolition and construction of alterations and additions to an exixting dwelling in a heritage area (Withdrawn : 06/08/2003 by Delegated Authority) | | [2007年04月19日] Construct a roller door in a Heritage Overlay and a Special Building Overlay. (Permit Delegated : 30/05/2007 by Delegated Authority) | | [2013年02月08日] Part demolition and construction of buildings and works (rear extension) to an existing dwelling in a Heritage Overlay and Special Building Overlay. (Permit Delegated : 21/11/2013 by Delegated Authority) | | [2013年08月24日] Construction of a swimming pool and safety fencing associated with an existing dwelling in a Heritage Overlay and Special Building Overlay. (Permit Delegated : 25/10/2013 by Delegated Authority) | | [2022年01月01日] Partial demolition and construction of alterations and additions to an existing dwelling in a Heritage Overlay and Special Building Overlay (SBO) | 搜索邻居的房屋改建历史 | 政府房屋报告 |
| | |