[2013年07月17日] Construction of a four storey apartment building (comprising 24 dwellings) plus basement with a reduction of visitor parking spaces (4 Station Street)
[2015年09月07日] Stage 2 Residential Development - Carpark Footing & Basement Slab Works Only (4 Station Street)
[2015年10月26日] Stage 3 - Residential Development - Post Tension Slabs Only (4 Station Street)
[2015年11月09日] Stage 4 - Residential Development - Architectural, Services & Vertical Structure Works Only (4 Station Street)
[2016年02月16日] 24 lot subdivision (4 Station Street)
[2016年06月07日] Construction of a four storey apartment building (comprising 24 dwellings) plus basement with a reduction of visitor parking spaces (4 Station Street)
[2016年07月12日] Stage 5 - Residential Development - Variation - Changes to the internal and external wall & door systems (4 Station Street)