Preston 平均房价House 价格比去年上升5% . 周边地区Bellfield | $959,200 | Coburg | $1,208,200 | Coburg North | $966,400 | Heidelberg West | $747,200 | Ivanhoe | $1,546,800 | Reservoir | $874,400 | Thornbury | $1,336,800 |
| A15 Malcolm Street, Preston | |
| 更多照片 |
建筑平面图 | 地图位置 | 附近房价 | 详细描述: | 后院是朝 南面. 地块的坡度是 稍微倾斜, 宽度是 14.8 米. 关于地块的详细描述... A Timeless Classic In A Perfect Location! The potential is immense. The location is superb. The opportunity? It could not be more perfect! With the potential for dual occupancy (STCA) on a generous 540sqm (approx.) allotment, an amazing opportunity presents itself for the astute home buyer/investor to make their mark on the footsteps of Coburg Hill. A five-star location oozes convenience at every turn, with the new Coburg Hill shopping precinct, Cox Reserve, Newlands Primary School and trendy Gilbert Rd cafes and trams all within walking distance. And given its close proximity to scenic Coburg Lake, the No.1 tram along Nicholson St and the bustling High St and Sydney Rd shopping and dining strips, this property presents an outstanding opportunity for the lucky buyer to live in a family-friendly location. The bones of this classically presented clinker brick home are strong and sturdy, meaning the potential is there to transform the pristine interior thats been freshly painted into a modern glamour. Among the homes features include a versatile formal lounge/dining, two bedrooms of generous proportions, high ceilings, separate family bathroom and rear sunroom with laundry access. The well-appointed kitchen with meals is Lot/Plan No: 1/PS819397 翻译中文 | 改建申请历史: | | [2016年03月21日] Proposed construction of a new dwelling to the rear of the existing dwelling as shown on the plans accompanying the application | | [2016年05月20日] ePathway | | [2017年12月05日] Construction of Dual Occupancy (Construction of x1 New Dwelling & Additions/ Alterations to the Existing Dwelling) | | [2018年05月29日] Two (2) Lot Subdivision as shown on the plans accompanying the application | | [2018年06月07日] Construction of Dual Occupancy Development: (Construction of a New Dwelling Only) - Stage 2: Remainder of Works | | [2018年06月29日] Construction of Dual Occupancy Development: (Construction of a New Dwelling Only) - Stage 3: Additions/Alterations to an Existing Dwelling | 搜索邻居的房屋改建历史 | 政府房屋报告 |
| | |