[2006年03月30日] 2 New Dwellings Construction of two (2) double storey dwellings in a Special Building Overlay, a roof deck in a Design and Development Overlay and removal of vegetation in a Vegetation Protection Overlay (57 Tramway Parade)
[2009年11月18日] 2 New Dwellings Construction of two (2) double storey dwellings in a Special Building Overlay and removal of vegetation in a Vegetation Protection Overlay 3 (57 Tramway Parade)
[2011年04月19日] 2 New Dwellings Construction of three (3) double storey dwellings, removal of vegetation and construction of a front fence exceeding a height of 1.2m. Cost $100,000 (57 Tramway Parade)
[2011年11月24日] Subdivision of Land (1 to 9 Lots) - SPEAR - S018745E - Two (2) lot subdivision (57 Tramway Parade)
[2012年04月10日] Demolition of Building. Cost $13,090 (57 Tramway Parade)
[2012年08月25日] Subdivision in accordance with Plan of Subdivision PS704177K. (57 Tramway Parade)
[2014年02月20日] Stage 1 - Construction of Two (2) Unit Development. Cost $600,000 (57 Tramway Parade)
[2014年09月11日] Subdivision of Land (1 to 9 Lots) Subdivide the land into two lots (57 Tramway Parade)